CLASS: LR
Unit: AlfaLaval Pure Ballast 3.2
Technology: Filter + UV
Rated capacity: 2×500 m3/h
Year: 2021
SRS Scope of Work:
- Workshop drawings (piping & outfitting)
CLASS: DnV
Unit: Headway OceanGuard BWMS HMT-800
Technology: Filter+Electro-Catalysis
Rated capacity: 1040 m3/h
Year: 2022
SRS Scope of Work:
- 3D scan of engine room on board the vessel
- Feasibility study with 3D piping and layout
- Class drawings (new & update of existing)
- Workshop drawings (piping & outfitting)
CLASS: DnV
Unit: Headway OceanGuard BWMS HMT-800
Technology: Filter+Electro-Catalysis
Rated capacity: 1040 m3/h
Year: 2021
SRS Scope of Work:
- 3D scan of engine room on board the vessel
- Feasibility study with 3D piping and layout
- Class drawings (new & update of existing)
- Workshop drawings (piping & outfitting)
CLASS: DnVGL
Unit: H+H
Year: 2021
SRS Scope of Work:
- Machinery Class. drawings and necessary calculations (pressure drop) for installation of SCR equipment on Exhaust gas system
CLASS: DnVGL
Unit: AlfaLaval PureBallast 3.2
Year: 2021
SRS Scope of Work:
- Feasibility study with 3D piping and component layout
- Class. drawings (New & Updated)
- BWTS Deckhouse structure
CLASS: DnVGL
Unit: Headway OceanGuard
Year: 2021
SRS Scope of Work:
- Feasibility study with 3D piping and component layout
- Class. drawings (New & Updated)
Dimentions: 152m x 38m x 9,15m
CLASS: DnVGL
Year: 2020
SRS Scope of Work:
- Class. drawings (Hull/Machinnery/Outfitting)
CLASS: DnVGL
Unit: Headway OceanGuard
Year: 2020
SRS Scope of Work:
- Feasibility study with 3D piping and component layout
- Class. drawings (New & Updated)
CLASS: DnV
Unit: AlfaLaval PureBallast 3.2
Year: 2020
SRS Scope of Work:
- Feasibility study with 3D piping and component layout
- Class. drawings (New & Updated)
- DeckHouse structure
CLASS: DnVGL
Description: Barge upgrade with sponsoons, additional Floating towers & existing Deckhouse raisng for 10m
Year: 2019
SRS Scope of Work:
- Class. drawings (Hull/Machinnery/Outfitting)
CLASS: LR
Owner: Algoma Central Coorporation
Year: 2019
Scope of Work:
- Lightship Calculation
- Stability Calculation
- Feasibility study
CLASS: LR
Unit: AlfaLaval PureBallast 3.1
Year: 2018
SRS Scope of Work:
- Feasibility study with 3D piping and component layout
- Class. drawings (New & Updated)
CLASS: LR
Unit: Langh Tech
Year: 2018
SRS Scope of Work:
- Feasibility study with 3D piping and component layout
- Class. drawings (New & Updated)
CLASS: LR
Unit: DeNora
Year: 2018
SRS Scope of Work:
- Feasibility study with 3D piping and component layout
- Class. drawings (New & Updated)
Type: Reefer/Container ship (PC7)
Class: DnVGL
Year: 2018
Basic design:
- Hull drawings & calculations
- Machinery drawings & calculations
CLASS: DnVGL
Unit: Optimarin
Year: 2017
SRS Scope of Work:
- Feasibility study with 3D piping and component layout
- Class. drawings (New & Updated)
- Workshop Drawings: Installation & Spool drawings
CLASS: HRB
Year: 2018
SRS Scope of Work:
- Main engine supporting structure
- E.R systems diagrams (New & Updated)
- Workshop Drawings: Piping Installation & Spool drawings
Type: Luxury Passenger ship
Class: BV
Year: 2018
SRS Scope of Work:
- Machinery drawings review (on behalf of Owner) including SRtP
Type: Great Lakes Bulk Carrier – Selfunloader
Class: LR
Year: 2015
Basic design:
- Hull drawings & calculations
- FEA of Unloading boom’s supporting structure
- FEA of Ship’s lounching
Detail design:
- Hull Tribon model for material order
Type: Subsea construction vessel
Class: DnV-GL
Year: 2015
SRS Scope of work:
- Longitudinal strength calculation